Then structure will transfer.
Load path from roof to foundation.
Engineered structures are composed of multiple types of members that connect in order to move the loads from the top to the bottom of the structure.
Design wind uplift load path wind uplift pressure vertical uplift component.
Vertical load path from roof to ground on a platform and pile construction building.
Load paths will vary depending on construction type and design.
Minimizing the load path to the foundation.
This effect is simply termed load path load paths need to be continuous.
The load path extends from the roof through each structural element to the foundation.
Load paths the economy and efficiency of the structure is improved by the following.
The process starts at the top with the uppermost roof element tracing the loads down through the structure to the foundation.
Loads in any building have to travel from the roof and upper floors down to the ground.
The continuous load path from the roof to the foundation has to resist uplift pressure that can rip roofs away from walls shear forces in the walls that brace the building sliding forces that tend to push the house off the foundation and overturning forces that tend to tip the house.
Adjacent framing members will receive more load if a connection fails.
Actually when load is coming on any structure.
Multiple elements are used to transmit and resist external loads within a building.